Challenge

At the intersection of two rural, high-speed roadsPioneer Parkway and Commerce Drive in Yavapai County—a traffic study prepared for a new residential development recommended a roundabout to provide intersection capacity and control and to lower speeds through the intersection.

Solution

Kittelson provided traffic engineering services and prepared construction documents for a multilane roundabout at Pioneer Parkway and Commerce Drive.  The project aimed to construct a roundabout that would operate efficiently and safely, serve the projected 2045 traffic demand and future multi-modal needs, and reduce speeds through the intersection on Pioneer Parkway. We also worked on drainage improvements and intersection lighting design and plans, and led the 3D modeling effort to prepare accurate construction plans and cost estimates. 

3D model of the multilane roundabout.

Aerial view of multilane roundabout in the desert.

Completed multilane roundabout. Photo credit: Lyon Engineering

The Outcome

A Turning Point for Safety at a High-Speed Intersection

The multilane roundabout is now fully operational and provides the intersection capacity and control that is needed to serve the future residential community.  

The roundabout at Pioneer Parkway and Commerce Drive has been a great addition to the intersection and has limited the amount of serious accidents.  We have not had any serious collisions since the installation of the roundabout.  The flow and functionality of the roundabout is working flawlessly as designed.”
—Roger McCormick, Yavapai County Project Manager